Well accomplished weekend despite us both being sick. Went down to IMM and got so many things done!
Updates to the Huiton house:
- Homogeneous tiles ordered - will start work soonish, like next week for the living room.
- Room laminate flooring chosen, cement screeching should have completed
- Kitchen design out, to finalise the material and nitty grits - I'd be having a red and black kitchen! Imagine red and black shiny shiny with all the cool cutting edge looking kettles and pots.
Went to Sim Siang Choon and bought:
- Water heater tank (30l) to power up for 2 toilets and sinks
- Sink and Tap
- Toilet paper holder
- Backside spray (beside the toilet bowl one :p)
- Hob and hood
Think it was cool to like look up at the designs, think about how this will match that and also 'that tap looks kinda cool'. Good thing CT decided against his beautiful 4 hobs. When you don't cook, get so many hobs for what! So we settle for 2, and it's black and shiny with metallic outline to match the sink, which is a big metallic thing. And a nice hood (chimney style.) Stylo right!
And a Samsung fridge. Not too big, just good for 2 pax.
Also, paid the deposit for the ROM venue. The Manager has changed 2 times since we were there the first time - hope the restaurant won't be gone before we ROM man!
Plus over the week, I have collected my Bulgari wedding band, and decided on my photographer for the ROM dinner! Good that things are falling into the right places. This is such an exhausting, time consuming and mentally draining testing period. Especially when I have to work late every night somemore. It's really all about spending money to solve the problems. Well, outsourcing for efficiency I guess. At least it'd be over in another 2 months time.
Then we will look at our bank book and cry.
But it's okay lar. We can do it!
No comments:
Post a Comment